India Statistical Strengthening Project  

now renamed as Support for Statistical Strengthening

Introduction

        India Statistical Strengthening Project (ISSP) now renamed as Support for Statistical Strengthening ( SSS) aims at development of statistical system in the state. The scheme was launched in the State during 2012-13 . After revisit of the scheme during 2015-16 (24.4.2015), the scheme constitutes following components.

Information Technology (IT) 

 

  •       Physical Infrastructure (PI), which includes construction of block statistics offices, construction of Parisankhyan Bhawan, Renovation and up-gradation of DPMU / Range/RIPAE&S buildings, Construction of two range level training centres at Koraput and Dhenkanal.

  •         Other associated costs viz. Annual maintenance, Hardware upgrades, web-hosting etc. @ 30% of IT cost.

  •      Implementation of recommendations of Technical Groups/Bodies for filling up existing and expected/emerging data gaps, including State/UT specific additionalities.

  •         HRD issues.

  •         Dissemination of Annual Reports on the performance of State Statistical Systems and improving the cost effectiveness and ease of data access

  •          Data quality and efficiency improvement measures.

 Period of Operation

The scheme was launched during 2012-13 and will continue up to 2016-17

 

Abstract of Project cost, Release of funds and Expenditure under the scheme ( Rs in lakh)

Share

Project Cost

Funds released( up to Aug,2015 )

Expenditure Incurred( up to Aug,2015)

Percentage expenditure on funds released

Remarks

Central Share

2881.18

1996.24

1646.28

82.4

 

State Share

2774.98

1893.86*

1423.86

75.2

*Rs470.00 lakh released to CE, building in 2015-16 for Parisankhyan Bhawan

Total

5656.16

3890.10

3070.14

78.9 

 


 

Component wise Activities under SSS  and Allocation of funds

Sl.No.

Component

Activity

Allocation ( Rs in lakh)

Central Share

State Share

Total

1

Information Technology (IT) 

Procurement of IT

143.08

270.60

413.68

2

Physical Infrastructure (PI)

 

Construction of block statistics buildings, Parisankhyan Bhawan, 02 Range level training centres,  Renovation and up-gradation of DPMU buildings/RIPAE&S/Range offices

2137.88

2504.38

 

4642.26

3.

Other associated costs viz. AMC etc 

AMC, internet etc

61.32

0.00

61.32

4

Implementation of recommendations of Technical Groups/ emerging data gaps

Improvements of methods on GSDP/DDP, quarterly GSDP, Environment statistics, capital formation ( private sector), small area estimates

70.00

0.00

70.00

5

HRD issues, 

Training capacity buildings, development of training materials /modules by experts to be engaged

180.00

0.00

180.00

6

Dissemination of Annual Reports on the performance ease of data access etc

Dissemination of reports, publicity, report preparation, development of data base, engagement of experts

183.00

0.00

183.00

7.

Data quality measures

Survey on Village level statistics / Survey on NSS with increased sample size  /CPI at District level, type studies for GSDP

105.90

0.00

105.90

 

Total

 

2881.18

2774.98

5656.16